Date agreed | 31/10/2019 |
---|---|
Date to be reviewed | 30/09/2023 |
Satisfaction with cleaning |
2018 to 2019 (Actual) 86% |
2019 to 2020 (Actual) 70% |
---|---|---|
Satisfaction with grounds maintenance |
2018 to 2019 (Actual) 100% |
2019 to 2020 (Actual) 80% |
Action | Due date |
---|---|
Bike Storage | 10/10/2024 |
Action | How it was achieved | Delivered on |
---|---|---|
Plants have been growing in the guttering causing water to overflow on to the brick work and causing damage to the fabric of the building.The guttering has been cleared of all plants and moss and this will cure the problem of water spillage on to the brick work.Spikes have also been placed on the top floor ledges stopping pigeons mess. This had been an ongoing health and safety issues to the residents who occupy the top floor. | spikes placed on the ledges and guttering cleared | 27/11/2020 |
Sinclair House 1-20. Pigeon netting in the whole front balcony of the block. Pigeons has been messing up the front balcony and lot of resident have made complaints about this issue. Installing Pigeons net in the balcony will help resolve the problem and the resident will live in a clean and healthy environment. | Pigeon netting/pigeon spike | 12/12/2022 |
Two bin chamber will be install in the designated bin area, There has been several complaints about people moving the bin from it designated area to a different location in the estate. By installing the bin chambers, it will eliminate the removal of bins from their designated location | Two bin chamber | 25/07/2023 |